Brandywine Hydroelectric Project

Transmission Lines

Westpark was selected by Ledcor Industrial Limited to construct a new transmission line to the Brandywine Creek Hydroelectric Project.

Work consisted of 1.8km of design-build 25kV wood pole transmission line, station service transformers, utility metering, underground power cables and telephone cable installation. The project was completed on time and budget, despite uncooperative winter weather.