Rutherford Creek 230kV IPP Tap Line

Transmission Lines

In early 2004, Westpark completed the tap connection from the Rutherford Creek Generating Station to BC Hydro s 230kV transmission system.Work consisted of design, procurement and installation of the overhead tap facility for the 50MW Rutherford Creek substation.A serious flood on Rutherford Creek during the construction period resulted in mid construction design change to the work, but the project was still completed on time and budget.