Shell Limestone Substation Addition

Substations

The works consisted of the installation of a 33MVA 138-25kV transformer, two 138kV circuit switchers, 138kV CVT s, 25kV metering, structural steel and wiring for protection and control. In addition, all civil work required for the equipment was included in the scope of work.

Some delay in the delivery of the Owner supplied transformer caused the project to be completed late, however, the schedule was maintained in all other respects.