Upper Mamquam Hydroelectric Project

Protection & Controls
Westpark Electric Ltd. completed the electrical works for the 25MW Upper Mamquam Hydro Project in 2005.
 
Westpark’s scope included installation of all plant 13.8kV switchgear, control equipment and power and control wiring, as well as interconnection to the 69 kV substation and installation of substation equipment.
 
Westpark also pre-wired the intake control building off site, and later installed it and related intake equipment.
 
Other work included termination of an extensive optical fiber network, and installation of communication equipment at other areas on and off site.
 
Despite a very constricted work area, all work was completed to meet the Owner’s schedule.
  • WestPark Project